I have been given some pictures of our Fox Run show that I would like to show you. Thank you Edwina.




Ford Model Railroad Club (FMRC) part 2
I have been given some pictures of our Fox Run show that I would like to show you. Thank you Edwina.




Posted by Ford Motor Railroad Club at 7:03 AM 0 comments
I see that Mike has been a busy bee this summer. Let's see what he has done now.......

Posted by Ford Motor Railroad Club at 6:44 AM 0 comments
Mike sent me this the other day. He is coming along.
Here's what he has to say......
"All of the track is permanently down. 3 tracks on the left are the new leads into the "outer loop" staging, the track on the extreme right will become the extended "inner loop" staging siding. Now I have to wire everything together, this may take a while." -Mike Guariento
Thanks Mike and keep up the good work!
Posted by Ford Motor Railroad Club at 4:31 AM 0 comments
Mike has sent me another photo of the hard work he is doing on our module.
"2010-08-08.04 This is the latest progress on the module I'm working on. The two main lines have been relaid - glued and nailed down. The turnout will lead into the staging tracks for the "outside" main." Michael Guariento
I know I would personaly like to that him for all the hard work he is doing. He really is helping make out module a "gem!"
Posted by Ford Motor Railroad Club at 3:07 AM 0 comments
Hey,
I was lucky enough to be sent another piece of the puzzle that Mike Guariento is working on. He states to me, in an email.......
"2010-07-18.03 The cork roadbed is down on the module top. The three turnouts are not permanently attached yet - they are just to give a visual idea of how the approach ladder will lead into the 3 yard sidings." ~ Mike Guariento
Thanks Mike for all your hard work.
Lisa
Posted by Ford Motor Railroad Club at 3:20 AM 0 comments
Guys,
Mike asked me to place these pictures of the module part he is working on. Thanks Mike for the wonderful work and pictures.
"This series of photos will (hopefully) show the progress I make during modifying the HO track arrangement on what we call the "Bridge" module (has the big Atlas bridge on the "O" scale side). The intent is to create an "approach" yard lead into the HO staging sidings, this will eliminate the need to back trains into these sidings and the resulting hold-up of following trains on the main." - Mike Guariento
2010-06-20.02 This shows how the HO track arrangement was before any work was started. Note that the "pink foam" extends to the very end of the module - this is structurally not a good condition as the foam takes quite a betting during setup and tear-down. It will be replaced. When I took on this project I did not realize this problem existed - oh well!
2010-07-04.01 The track and old cork roadbed has been removed. The "pink foam" has been cut back from the ends to allow a 1 x 2 to be inserted in the end plate areas.
2010-07-05.05 This shows the completed end plate modification with the new 1 x 2 glued and screwed in place (both ends).
Posted by Ford Motor Railroad Club at 9:30 AM 0 comments
The FMRC was created by Ford Employees sharing an interest in model railroading. We have a large modular layout that combines HO scale with O gauge trains. The goal of the club is to have an excellent operating layout that demonstrates the members' interests in both scales.
We encourage Ford employees and retirees to join but welcome people from outside of the Ford Motor Company family.