Guys,
Mike asked me to place these pictures of the module part he is working on. Thanks Mike for the wonderful work and pictures.
"This series of photos will (hopefully) show the progress I make during modifying the HO track arrangement on what we call the "Bridge" module (has the big Atlas bridge on the "O" scale side). The intent is to create an "approach" yard lead into the HO staging sidings, this will eliminate the need to back trains into these sidings and the resulting hold-up of following trains on the main." - Mike Guariento
2010-06-20.02 This shows how the HO track arrangement was before any work was started. Note that the "pink foam" extends to the very end of the module - this is structurally not a good condition as the foam takes quite a betting during setup and tear-down. It will be replaced. When I took on this project I did not realize this problem existed - oh well!
2010-07-04.01 The track and old cork roadbed has been removed. The "pink foam" has been cut back from the ends to allow a 1 x 2 to be inserted in the end plate areas.
2010-07-05.05 This shows the completed end plate modification with the new 1 x 2 glued and screwed in place (both ends).
Saturday, July 10, 2010
Pictures for Mike Guariento
Posted by Ford Motor Railroad Club at 9:30 AM
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment